Bosch Munitech assists ERWAT with Hartebeestfontein Water Care Works upgrade

ERWAT APPT 1On the strength of its multiple CIDB grading (8CE, 8ME, 8EP, 8EB), Bosch Munitech was recently appointed as the main contractor by ERWAT, for the completion of engineering works for the upgrading of the final settling tank capacity at the Hartebeestfontein Water Care Works, which is situated at the ERWAT head offices in Kempton Park.

The scope of appointment consists of civil, mechanical, electrical and control works with the main components summarised below:

  • ERWAT APPT 2Extensive earthworks and trenching;
  • Testing of works installed by a previous contractor;
  • Completion of civil works related to two new Final Settlement Tanks (FSTs);
  • Pipework and tie ins required to existing reactors;
  • Full mechanical installation of new RAS pump station and linkages to existing lines;
  • Coordination of mechanical contractors appointed under the previous contract for the mechanical installation at
  • thehead of works and FSTs;
  • All new electrical works, including commissioning of new MCC and PLC equipment;
  • Total upgrade of PLC, SCADA and HMI programming and system integration.

 

Work on site commenced in early March 2014 and the project will be completed within 4 months.

 

Our Vision

Our vision is to be a world class engineering and operations group that provides innovative solutions globally. Our business is fortified by adhering to a strong set of values including; integrity, delivery, people, accountability, teamwork, innovation and fun.

Contact Us
Nairobi: +254 (0) 715 770 234

Parklands Road, Office Suites
Block B 4th Floor
Nairobi
Kenya

LinkedIn

Sign up for Our Newsletter
* = required field